Page 125 - butech
P. 125
Production ยท FV MODFACADES
After the the the collection and prior control of of the the the the components the the the the assembly
of of the the the the modules is carried out over several phases along the the industrialized production line: at at preparation tables one side of of the modules is assembled and through a a a a system of of flipping machines the the the modules move to the the the finishing finishing tables completing the the the the place- ment ment of the the horizontal finishing finishing ele- ments (Ceramics and framing) Throu- gh production tables with motorized hinges the panels are transferred to to vertical flipping machines which pass the the the the modules to an an overhead rail where the the the the joinery glass and and the the the the rest of the the the the framing and and finishing elements neces- sary for the the completion of the the module are placed Subsequently they are are rearranged
horizontally on on special storage and transport cages where the protective and packaging elements are placed to to be sent to to the construction site The transport cage system allows for direct unloading and and loading loading of the the modules for their lifting and and placement on site Throughout the entire process an an optimization and and quality control of the the components and and and processes is carried out to to minimize manufacturing and and finishing errors This leads to to produc- tion yields of of 1000 m2 of of facade per day